# Holdbacks and price adjustments: remedies for technical findings

Source: https://techduediligence.co/insights/holdbacks-and-price-adjustments/

A technical finding matters to a deal only once it is attached to a remedy. Market practice offers four main ones: a condition precedent, a price adjustment, a holdback and a warranty. The craft lies in matching each material finding to the one that fits it.

## Key points

- Ask two questions of every material finding: can it be fixed before closing, and can its cost be estimated?
- Use a condition for what must be fixed, a price adjustment for what can be costed, a holdback for what is uncertain but bounded in time, and a warranty or indemnity for the rest.
- Size the remedy from the remediation estimate, expressed as a range, and avoid charging for the same problem twice.
- Define the release of a holdback by an objective test, such as a re-scan or an executed document.

## Four remedies in outline

| Remedy | What it does | Fits a finding that is |
|---|---|---|
| Condition precedent | The seller must resolve the matter before closing | Fixable, clear-cut, and unacceptable if left |
| Price adjustment | The purchase price is reduced | Known, and capable of being costed |
| Holdback | Part of the price is withheld for a period | A known risk of uncertain size that will resolve within a set time |
| Warranty or specific indemnity | The seller stands behind a statement or agrees to bear a named loss | Unknown, or known but unlikely and potentially large |

The terms vary. A holdback may be called a retention, and the sum may be kept by the buyer or placed with a funds escrow agent. Indemnities are used more freely in some markets than in others. This article describes general market practice and is not legal advice. Remedies differ by jurisdiction and by deal, and counsel should be consulted.

## Matching findings to remedies

Two questions sort most findings. Can the matter be fixed before closing? Can its cost be estimated with reasonable confidence?

**Fixable before closing.** A contractor wrote part of the product and never signed an assignment. The natural remedy is a condition precedent: the assignment is obtained before the deal closes. Secrets found in the code history fall in the same group. Rotating them is cheap and quick, and there is no reason to carry the risk across closing.

**Not fixable in time, but capable of being costed.** The product runs on a framework that is no longer supported, and moving off it will take several engineer-months. Nothing is hidden and nothing is in dispute. The remedy is a price adjustment based on the cost of the work. How to estimate that cost is covered in [technical debt in M&A: how to price it](/insights/technical-debt-in-m-and-a/).

**Known, but uncertain in outcome.** A component under a copyleft license sits in a commercial product, and the seller has started to replace it. The work may finish cleanly or it may not. A holdback fits: a sum withheld until the replacement is complete and verified, then released.

**Unknown, or unlikely but severe.** The buyer cannot establish whether personal data was exposed in a past incident. A warranty, a specific indemnity or both allocate that risk to the seller without requiring a figure today.

Security incidents show how remedies combine. Verizon agreed in July 2016 to buy Yahoo's operating business. Yahoo then disclosed two large data breaches. In February 2017 the parties reduced the price by US$350 million and divided certain liabilities between them: a price adjustment and an allocation of future liability together. The case is examined in [Yahoo and Verizon: the breaches that took US$350 million off the price](/insights/yahoo-verizon-data-breach-price-cut/).

Some findings fit none of the four. Dependence on one or two engineers is not cured by a price reduction. It is addressed through retention arrangements, a transition period or the structure of the deal itself.

## Sizing the remedy from data

A remedy needs a number, and the number should come from the finding.

The starting point is remediation effort: how many engineer-months the work will take, converted to a cost band. A band is more honest than a single figure, because estimates of software work are uncertain. It also gives the negotiation a floor and a ceiling.

Three cautions apply.

1. **Avoid double counting.** If the valuation already assumed a level of maintenance spending, part of the remediation cost is in the price. An adjustment should cover the excess, not the whole.
2. **Separate cost from risk.** The cost of replacing a component is one thing. The exposure if a license holder brings a claim first is another. A price adjustment suits the first and a holdback or indemnity the second.
3. **Keep proportion.** Every codebase has findings. A remedy is for the material ones, those that change the value or the risk of the deal.

## Holdbacks: who holds the money and when it is released

A holdback is money. It is either kept by the buyer until the release date or paid to a funds escrow agent, usually a bank or a law firm, under its own agreement. That is escrow of funds. It is a separate arrangement from the escrow of code and transaction materials, and a software escrow provider is not the party that holds it.

The release test is where holdbacks succeed or fail. "To the buyer's reasonable satisfaction" invites a dispute. An objective test does not: a re-scan showing that the component has been removed, an executed assignment, a completed migration confirmed by both technical leads.

Time limits matter as well. A holdback with no end date becomes a permanent price reduction. Where the release depends on the seller's team continuing to work after closing, the arrangement begins to resemble an earn-out, a structure discussed in [earn-outs and staged transactions](/insights/earn-outs-and-staged-transactions/).

## What a seller can do first

Remedies are smaller when the seller arrives prepared. A finding the seller discloses, with a plan and a cost, is negotiated as a known item. The same finding discovered by the buyer late in the process is negotiated as a question of trust.

The practical steps are to review your own code before the buyer does, fix what is cheap to fix, obtain missing assignments while the people concerned are still easy to reach, and put a costed plan beside what remains.

## How we approach it

We express remediation effort in engineer-months and as a cost band. In analyst-verified and expert reports, an in-house analyst pairs each material finding with the market-standard remedy, whether a holdback, a warranty, a condition precedent or a price adjustment, and sequences the work into a plan for the first hundred days. Completed fixes are verified by re-scan. This is data-backed negotiation support, not advisory. The parties and their counsel decide what to ask for and what to accept.

Both sides read one report in the same words, and the seller responds beside each finding, on the record. The discussion of a remedy then starts from shared facts.

We hold code and transaction materials in neutral custody. We do not hold purchase funds or holdback amounts. The review is described under [technical due diligence](/tech-due-diligence/), and custody and closing on the [escrow and IP Package page](/escrow-and-ip-package/).

## Questions we are asked

### Do you tell us which remedy to demand?

No. We show the remedy that market practice usually attaches to a finding of that kind, and the cost band behind it. That is data-backed negotiation support, not advisory. The decision belongs to the parties and their counsel.

### Can a holdback be released on the basis of a re-scan?

Yes, if the parties write the release test that way. We verify completed fixes by re-scan, and the result is reported to both sides. The funds themselves are released by whoever holds them under the funds agreement.

### Does every finding need a remedy?

No. Most findings in a report are ordinary maintenance matters. Remedies are for the material ones, and the first page of the report names the top risks and any deal blockers.