A technical finding changes the price only when it becomes a figure both sides accept. That takes three steps: estimating what the finding costs, deciding who should bear it, and raising it while there is still room to negotiate. A price reduction is one result among several, and often not the best one.

## Key points

- Turn each material finding into a cost, a range or a named risk before you raise it.
- Match the remedy to the finding: certain costs to price, uncertain ones to holdbacks and indemnities, fixable ones to conditions.
- Raise findings before signing, while every remedy is still available.
- Argue from evidence the other side can open and check.

## From finding to figure

A finding in a technical due diligence report is a statement about software: this library is unsupported, this module has one author, this data was exposed. A negotiation needs a statement about money. The translation depends on how the cost behaves.

**Work that must be done.** Replacing an unsupported framework, removing a copyleft library from the core product or rewriting a module nobody understands are all pieces of work. They can be estimated in engineer-months and multiplied by what an engineer costs. The honest result is a range, and a range is enough to negotiate on.

**Costs that recur.** A cloud bill that grows faster than revenue, a third-party license charged per user or operations that engineers perform by hand do not need fixing once. They lower the margin every year, and belong in the valuation model. The article on [technology and valuation](/insights/technical-due-diligence-and-valuation/) follows that route.

**Liabilities that may or may not arise.** A past exposure of personal data, a contractor who never assigned the code, a license breach the licensor could pursue. Neither the probability nor the size is known, so no single figure is right.

Only the first kind reduces neatly to a number. Much of the frustration in negotiating technical findings comes from forcing the other two into a single deduction.

## Matching the remedy to the finding

A share purchase agreement (SPA) offers several ways to allocate a risk, and the price is only one of them.

| Kind of finding | Example in general terms | Usual remedy |
|---|---|---|
| A certain cost the buyer will bear | Upgrading dependencies that are out of support | Price adjustment |
| A defect the seller can cure | A missing assignment from a contractor who can be reached | Condition precedent |
| An uncertain liability | Personal data exposed in the past, consequences unknown | Specific indemnity or holdback |
| A statement that cannot be fully checked | No other copyleft code is distributed with the product | Warranty |

The logic is that a party should carry the risks it is best placed to assess or control. A seller who is confident that an old incident had no consequences can show that confidence by accepting an indemnity.

The article on [holdbacks, conditions and price adjustments](/insights/holdbacks-and-price-adjustments/) treats each remedy in detail. This is general information and not legal advice. The terms available differ by jurisdiction and by transaction, and counsel should be consulted.

## Findings that move the price, and findings that do not

Not every finding is worth raising. A company that is five years old has technical debt, some outdated dependencies and gaps in its tests. The price a buyer offered for a company of that age already assumes them.

Three kinds of finding do move terms:

1. Findings that contradict what the buyer was told, such as a platform described as built for multiple customers that in fact runs a separate copy for each.
2. Findings that undermine an assumption in the model, such as a growth plan the architecture cannot carry without a rebuild.
3. Findings that touch ownership or the ability to operate, such as core code with no assignment, or a product only one person can release.

A report that presents forty findings with equal weight weakens the five that matter. On the pricing of ordinary debt, see [technical debt in M&A](/insights/technical-debt-in-m-and-a/).

## Timing decides what a finding is worth

The same finding has a different value at each stage of a transaction.

- **Before the offer.** It shapes the valuation, and nobody has to move from a stated position.
- **During exclusivity.** The price can still change, but every change is now a concession by one side.
- **Between signing and closing.** Only what the agreement provides is available.
- **After closing.** The buyer has a warranty claim, subject to caps, time limits and the need to prove what the software was on the closing date.

For a buyer the practical conclusion is to have the review complete early in exclusivity, not in its last week. For a seller it is to find the issues first. A problem the seller discloses with a plan attached costs less than the same problem discovered by the buyer.

## An example in general terms

Suppose a review finds that a billing module was written in 2019 by a contractor who never signed an assignment, and that it depends on a library its maintainers have abandoned. These are two findings with two different remedies.

The assignment is a defect the seller can cure, so it becomes a condition precedent: the seller obtains the signature before closing. The library is work that must be done. The review estimates the effort, for illustration four to six engineer-months, and the parties adjust the price or schedule the work in the plan for the first hundred days.

Each outcome follows from what the finding is.

## Arguing from evidence both sides can open

Negotiations over technical findings stall on trust. The seller suspects the buyer's adviser of inflating problems to justify a lower price. The buyer suspects the seller of minimizing them.

When each finding is linked to its source, whether a file, a commit or a clause in a contract, the argument moves from whether the problem exists to what it costs.

The seller's reply belongs in the same record. Context often reduces a finding: the abandoned library is used only in test tooling, or the exposed credential was revoked years ago. A reply that both sides can read, set beside the finding, corrects the estimate without a contest of experts.

## How we approach it

Our reports state remediation effort in engineer-months and as a cost band, so that a finding arrives with a figure attached. In the Analyst-Verified and Expert reports, each material finding is paired with the market-standard remedy: a holdback, a warranty, a condition precedent or a price adjustment. The work is then sequenced into a plan for the first hundred days, and completed fixes are verified by re-scan. This is data-backed negotiation support, not advisory.

The report does not advocate for either side: every claim cites a finding, and every finding opens its source material. The seller responds beside each finding, on the record.

The levels of review are set out on the [technical due diligence](/tech-due-diligence/) page, and the [sample report](/sample-report/) shows how a finding, its evidence, its cost and its remedy appear together.

## Questions we are asked

### How large a price reduction do technical findings usually produce?

There is no reliable general figure, and we would distrust one. Many material findings end in a condition or a holdback and leave the headline price untouched.

### Do you advise on the price or negotiate for one side?

No. We set out the findings, the remediation cost and the market-standard remedy for each material issue, which is data-backed negotiation support, not advisory. The negotiation is conducted by the parties and their advisers.

### Can a finding be fixed before closing so that it need not be priced?

Often, yes. The data room stays synchronized with the seller's systems, a delta scan runs on every change and the report can be regenerated until closing. A completed fix is verified by re-scan, so both sides can see that the finding is closed.