# The technical due diligence process, step by step

Source: https://techduediligence.co/insights/technical-due-diligence-process/

Technical due diligence follows the same sequence on almost every software transaction: agree the scope, gather the material, read it, test the findings with the seller, turn them into terms, and keep a record of what was transferred. Knowing the sequence tells you where time is lost and at which points the findings can still affect the transaction.

## Key points

- Fix the scope in writing before access is requested, including which entities, products and repositories are in.
- Treat the readiness of the data room as the critical path, because a review cannot be faster than the access it is given.
- Insist that every finding gets a written response from the seller before it reaches the investment committee.
- Carry material findings into the agreement as specific remedies, and keep the evidence after closing.

## Step 1: agree the scope

Scope follows from two things: what the buyer will own after closing, and what the buyer will have to run. A share purchase brings the whole company with its history. An asset purchase brings only what is listed, so the list has to be exact. A carve-out brings software that may depend on systems the parent is keeping.

A written scope names the products, repositories, environments and agreements to be examined, the depth of the review, who may rely on the report and when it is due. Vague scope is the usual source of late surprises. A second product nobody mentioned, or a repository held by a subsidiary, tends to appear in the third week.

## Step 2: build the data room

A technical data room is different from the document room the lawyers use. It holds live sources as well as files: the repositories with their full history, the dependency manifests, the infrastructure definitions, the agreements with their IP clauses, and the security and incident records.

History matters. A zip file of the latest code shows what the product is today. Only the history shows who wrote it, which is the evidence for both ownership and dependence on individuals. The contents are covered in detail in [what belongs in a technical data room](/insights/technical-data-room/).

This is the step where most calendar time is lost. Confidentiality agreements are negotiated, the seller's security team reviews the request, and engineers with other work to do assemble exports. A review that is quoted at two weeks can spend three weeks waiting to begin.

## Step 3: the first read

Once the material is available, automated tools read all of it. They list every third-party component and its license, match components against published vulnerabilities, search the code and its history for credentials, map the structure of the system and attribute each part of the code to its authors.

The output is complete and fast, and it has no context. It will contain items that look alarming and are harmless, and it cannot say what any of them means for the price. Its value is that it tells the reviewers where to look.

## Step 4: verification, questions and answers

An analyst now tests the findings. False positives are removed. Each remaining finding is rated in context: a vulnerable library in an internal test tool is not the same risk as the same library in the payment path.

Questions then go to the seller, and the seller's answers change the picture. A missing assignment turns out to exist in a filing cabinet. A dependency flagged for its license turns out to be used only in development. Other answers confirm the finding, and occasionally an answer raises a new one. In a deeper review, this step also includes sessions with the seller's engineers on architecture, process and the roadmap.

How the exchange is recorded matters more than it seems. Where questions travel by email and calls, the final report often contains findings the seller has never seen in writing, and the first proper discussion of them happens in the price negotiation. A process in which each finding carries its question, its answer and its status avoids that.

## Step 5: from findings to terms

A finding that stays in the report has achieved nothing. Each material finding should leave the review by one of a small number of routes.

| Finding | Usual route into the transaction |
|---|---|
| A former contractor never assigned the code they wrote | Condition precedent: the assignment is signed before closing |
| A component under a conflicting license can be replaced | Fixed before closing, then checked again |
| A framework is out of support and must be replaced | Price adjustment, or a budget line in the plan, based on the estimated cost |
| A past incident cannot be fully explained | Specific indemnity, secured by a holdback |
| Knowledge is concentrated in two engineers | Retention terms, and documentation work in the first hundred days |

To be usable, a finding needs a size. Remediation effort expressed in engineer-months and as a cost range gives the deal team a figure to negotiate with and counsel a basis for drafting. The options are set out in [holdbacks, conditions and price adjustments](/insights/holdbacks-and-price-adjustments/). Which remedy fits is a matter for the parties and their counsel. This article is general information and not legal advice, and practice differs by jurisdiction.

## Step 6: closing and the record

Software does not stand still between the report and closing. Engineers commit changes every day, so the code the buyer receives is not exactly the code that was reviewed. A final check at closing confirms what is being transferred and that agreed fixes were made.

The record of that state has value later. If a warranty claim arises eighteen months after closing, the question will be what the code contained on the day, and what each side knew. Without a dated, intact record, [the evidence for a claim](/insights/warranty-claims-evidence/) has to be reconstructed from systems the buyer has since changed.

## How we approach it

We run the process as four steps of one engagement.

**Find the risks.** The seller connects repositories, infrastructure and contracts to a data room that stays synchronized with their systems. The Automated Scan Report follows within 72 hours of the room being ready, and the Analyst-Verified Report, our standard [technical due diligence](/tech-due-diligence/) engagement, in about a week.

**Price them.** Remediation is estimated in engineer-months and as a cost band. In analyst-verified and expert reports, each material finding is paired with the market-standard remedy, and the work is sequenced into a plan for the first hundred days. This is data-backed negotiation support, not advisory.

**Close safely.** Code and transaction materials are held in neutral custody and released only on the conditions the parties configured. On closing day a final full scan runs, both sides sign off, and what the transaction transfers is sealed into a single [IP Package](/escrow-and-ip-package/).

**Keep the evidence.** The sealed record is retained for three years in the evidence vault, which is part of every engagement.

## Questions we are asked

### When should the process start?

As early as the seller will allow access. Our delivery times are targets counted from the moment the data room is ready to scan, not from instruction, so inviting the seller to connect its systems is the first thing to do. The counterparty is invited at no charge, and guided onboarding typically has the room ready in under a day.

### What happens if the code changes after the report is written?

It will change. In our process the data room stays synchronized with the seller's systems, a delta scan runs on every change, and the report can be regenerated until closing. The final full scan on closing day fixes the state that is transferred.

### Does the seller see the findings?

Yes. We produce one report, read by both sides in the same words, and the seller responds beside each finding, on the record. There is no side channel. A finding the seller has answered in writing is easier to negotiate than one raised for the first time at the table.