What the section is for
The readers of an investment committee (IC) memo are partners, operating partners and sometimes the credit side of the house. Few are engineers. They read the technology section to learn whether the technology supports the investment case, what it will cost them, and whether anything should stop the transaction.
The section is a translation of the technical due diligence report, not a new analysis. It is usually written by a member of the deal team, working from the reviewer's findings. That is where things go wrong. Findings are softened to protect the deal, or copied in language the committee cannot follow, or summarized until nothing checkable remains. Where a technical term cannot be avoided, explain it in a few words. The glossary for dealmakers can help.
A useful discipline is to write nothing in the memo that cannot be traced to a finding in the report. If the report's own first page is well made, most of the section can be taken from it directly. For what that page should contain, see what a technical due diligence report should contain.
A structure that works
Six parts, in this order, cover what a committee needs.
- Verdict. One paragraph with the overall rating and the answer to the question the thesis depends on.
- Top risks and top strengths. No more than five of each, with consequence and source.
- Deal blockers. Issues that must be resolved before the committee should approve, or an explicit statement that there are none.
- Remediation cost. The total as a band, split into one-time and recurring, and whether the model already includes it.
- Remedies. For each material risk, the term proposed in the transaction documents.
- Open items and coverage. What is outstanding, and what the review did not examine.
A committee member who stops reading after the first part should still leave with the right conclusion.
Writing the verdict
The verdict answers the question the thesis asks of the technology. For a growth case, that is whether the product can carry the planned volume. For a buy-and-build strategy, it is whether the platform can absorb acquisitions. For a carve-out, it is whether the software can run without the parent.
A weak verdict reads: "The technology is broadly sound with some areas for improvement." It could describe any company. A stronger one reads: "No blockers. The platform can support the growth in the base case. Two ownership gaps need signatures before closing, and replacing an unsupported component will take about five engineer-months in year one, which the model includes."
Use the same rating scale on every memo the fund produces. A committee calibrates over time, and a scale that changes from deal to deal cannot be calibrated.
Risks and strengths, five of each
Each risk needs four things: what it is, what it means for this investment, what it costs, and what is proposed. A table keeps the entries honest, because an empty cell is visible. The rows below are illustrations.
| Risk | Consequence for the case | Cost | Proposed remedy |
|---|---|---|---|
| Two contractors wrote the payments module and never signed assignments | Ownership of a core component is unproven | Legal cost only | Signed assignments as a condition of closing |
| The database version reaches end of support next year | A forced upgrade in the first year | Four to six engineer-months | Budget line in the plan, reflected in price |
| One engineer made most of the changes to the pricing engine | Releases stall if that person leaves | Retention and documentation effort | Retention terms and knowledge transfer in the first hundred days |
Strengths deserve the same discipline. "Strong engineering culture" is an impression. "Releases go out weekly, with automated tests on the core modules and changes reviewed by a second engineer" is a strength a committee can weigh.
Blockers, cost and remedies
A blocker is an issue that, left unresolved, means the committee should not approve. Typical examples are core software the target does not own, a license breach that affects the main product, or an undisclosed security incident. If there are none, say so in a sentence of its own.
State the remediation cost once, as a total band, and reconcile it with the model. The committee wants to know whether the figure is already in the capital plan, taken off the price, or still unfunded. Separate the one-time work from anything that raises the running cost of the business.
Then connect each material risk to a remedy: a price adjustment, a holdback, a warranty or indemnity, or a condition precedent. The logic of choosing among them is covered in holdbacks, conditions and price adjustments. The drafting belongs to counsel. This article is general information and not legal advice, and practice differs by jurisdiction.
Open items and what was not examined
Committee approvals are often conditional, and the technology section should make the conditions easy to state. List each outstanding item with an owner and a date: a repository not yet provided, a question the seller has not answered, a penetration test still under way.
Be equally plain about coverage. If the review did not see the production environment, or covered four of six products, the committee should know that its comfort extends only as far as the review did.
If the report can change between the memo and closing, say how the committee will hear about it.
How we approach it
Page one of our report is built to be the source for this section. It is a verdict for the investment committee: an overall risk rating, the top five risks, the top five strengths, the deal blockers and a remediation cost band. On analyst-verified and expert engagements, an in-house analyst writes that summary after verifying the findings and removing false positives.
Every claim on the page cites a finding, and every finding opens its source material, so a deal team can quote the page knowing each sentence can be checked. Each section states what was examined and what was not, which supplies the coverage paragraph. Material findings are paired with the market-standard remedy, as data-backed negotiation support, not advisory.
The data room stays synchronized with the seller's systems and the report can be regenerated until closing, so the memo can be reconciled with the latest version. Our page for funds describes the arrangements, and the sample report shows the first page.
Questions we are asked
Who should write the technology section, the deal team or the reviewer?
The deal team owns the memo, but the section should stay as close to the reviewer's own summary as possible. In our analyst-verified and expert reports the analyst writes the committee summary, so the deal team can adopt it instead of paraphrasing it.
How long should the section be?
One to two pages is usually enough if the full report is attached or linked.
What if the report changes after the memo has been circulated?
Tell the committee what changed and why. Our reports can be regenerated until closing, with a delta scan on every change to the seller's systems, so a late change is visible and dated.