Where the weeks go
A traditional review is a consulting project, and it moves at the pace of one.
| Phase | What happens | Why it takes time |
|---|---|---|
| Engagement | Scope, fee quote, engagement letter | Each transaction is scoped and priced from scratch |
| Access | Confidentiality terms, security review, credentials | The seller's counsel and engineers approve each step |
| Collection | Code and documents gathered against a request list | The material is assembled by hand, by people with other work |
| Review | Reading, interviews, analysis | Senior reviewers are booked on other work, and interviews must fit diaries |
| Reporting | Draft, comments, final report | Each round of comments adds days |
Only the fourth row is the review itself. The others are preparation and administration, and together they often take longer. A team that is told "two to three weeks" is frequently hearing the length of the fourth row alone.
Why the timetable matters inside exclusivity
Exclusivity is a fixed window, usually measured in weeks, in which financial, legal, commercial and technical work all run at once. The technical findings have three destinations inside that window: the paper for the investment committee (IC), the share purchase agreement (SPA), and the price.
Each destination has its own deadline, and all three fall before the end of exclusivity. Counsel needs findings while the warranties and conditions are still being drafted. The IC needs them before it approves. A price discussion needs them while the seller still has reason to engage.
A report that lands in the final week serves none of these well. The buyer is left with three poor options: ask for an extension, which the seller may refuse; reopen the price late, which costs goodwill; or proceed without having absorbed the findings. The planning problem is treated at length in fitting technical due diligence inside the exclusivity window.
Order matters as well as speed. The findings that take longest to cure are usually about ownership, because curing them can mean finding a former contractor and obtaining a signature. Those need to surface in the first days, not the last.
What actually drives the duration
Six factors account for most of the variation between one review and another.
- Access. How quickly the seller grants it, and in what form. Read-only connections to the live repositories are faster and more complete than exported copies.
- The state of the seller's records. Code is easy to produce. Signed agreements with everyone who ever contributed are not, if nobody has kept them in one place.
- The size of the estate. The number of products, repositories and legal entities. This matters a great deal when people do the reading and much less when software does.
- The depth required. A first read, a verified review and a review with architecture sessions and team interviews are different pieces of work.
- The seller's responsiveness. Every finding raises a question, and each unanswered question holds a finding open.
- The reviewers' availability. A provider that staffs each engagement from a small bench of senior people starts when they are free.
Of the six, only the last is fully in the provider's hands. The first two are in the seller's, which is why a seller who has prepared before the term sheet shortens the process more than any other single measure.
Where the clock starts
Quoted durations are comparable only if they start from the same moment. "Ten working days" from instruction and "ten working days" from complete access are different promises.
A time counted from instruction includes the access phase, which the provider does not control, so it tends to be quoted long or missed. A time counted from readiness is one the provider can actually commit to, but it tells you nothing about how long readiness will take. Ask for both figures. Ask also what happens when the material is incomplete on the day: whether the review waits, or proceeds on what is there and says so.
How to shorten the review without thinning it
Time can be taken out of a review honestly in four ways.
- Start access on day one. Send the seller the access request with the letter of intent, not after the kickoff call.
- Connect, do not export. Direct connections remove the collection phase and keep the material current as the code changes.
- Stage the depth. Begin with a fast first read and spend expert time only where it points. The choice of depth is discussed in red-flag report or full review.
- Keep questions with the findings. A single record of question, answer and status saves the days that are lost reconciling email threads.
Time should not be saved by reading a sample of the code and reporting on the whole, by skipping the history, or by leaving out the seller's response. Each of those produces a report that is faster and worth less. If coverage has been reduced, the report should say exactly where.
How we approach it
Our delivery times are targets, and they are counted from the moment the data room is ready to scan, not from instruction.
- Automated Scan Report: within 72 hours of the data room being ready.
- Analyst-Verified Report, our standard engagement: about a week.
- Expert Deep-Dive, for platform acquisitions and contested valuations: about two weeks.
The work takes days because our technology reads the code and the contracts, and our analysts spend their time on verification and judgment. The phase before the clock starts is short as well. The counterparty is invited at no charge, guided onboarding typically has the room ready to scan in under a day, and a readiness score shows both sides what is still missing.
The data room stays synchronized with the seller's systems, a delta scan runs on every change, and the report can be regenerated until closing. The levels of technical due diligence and the sequence of an engagement are set out on how it works.
Questions we are asked
What happens if the seller is slow to provide access?
The readiness score shows both sides what is missing, so the cause of a delay is visible. Our targets run from the moment the room is ready to scan. If a seller only uploads files and does not connect its systems, we scan what is there and the report states its coverage.
Does a faster review mean a shallower one?
Not when the speed comes from automating the reading. Software reads the whole codebase and its history, where a manual review must sample. Each section of our report states what was examined and what was not, so the depth is on the page.
Can the work start before exclusivity?
It can if the seller agrees to open a data room early, and a seller who has prepared has good reason to. For founders we offer a deal-readiness arrangement with a standing data room, a quarterly self-scan and a readiness score, described on our page for founders.