Integration budgets are usually written before anyone on the buyer's side has read the target's architecture. They are then revised upward in the months after closing, as the architecture reveals itself. Five subjects can be examined during technical due diligence that turn the first estimate into one you can defend.

6 min readUpdated Codekeeper Transaction Services

Why integration estimates fail

Most estimates are made by analogy. The last acquisition took nine months, so this one will. Or they are made from an architecture diagram prepared for the data room, which shows how the system was meant to be built.

The synergy case then adds assumptions of its own: one login for customers of both products, one invoice, one data platform, one hosting contract. Each is reasonable as a goal. Each is also an engineering project whose size nobody knows until someone has read the code.

Because synergies are part of the valuation, this is a price question and not only a planning one. If consolidating the two billing systems will take two years instead of two quarters, the model that justified the price is wrong, and you want to know that before you sign.

Decide what integration means for this deal

"Integration" covers three quite different intentions, and the review should be told which applies.

IntentionWhat changesWhat diligence must establish
Stand-aloneReporting, security standards, shared ownershipSecurity exposure, operating cost, key people
ConnectedSingle sign-on, shared billing, data exchanged between productsQuality of interfaces, identity model, data definitions
AbsorbedFeatures rebuilt on your platform, target's stack retiredCoupling, data migration, what knowledge must be retained

A target you plan to leave alone needs little architectural review. A target you plan to absorb needs a great deal, and the cost of absorbing it may exceed the cost of the technical debt the review finds.

Coupling: how separable the parts are

Suppose you intend to keep the target's analytics engine and retire its user management in favor of yours. Whether that takes weeks or a year depends on how tangled the two are.

Coupling can be read from the code. A dependency map shows which modules call which. Shared database tables show where two parts of the product write to the same data. The commit history shows which files always change together, which is often a more honest picture than the diagram.

A single large codebase is not a defect in itself. It becomes a cost only when your plan depends on splitting it. An architecture review should state, for each part you intend to keep, replace or retire, what else would have to change.

Data: structure, quality and permission

Data migration is commonly the longest task in an integration, and the one most often estimated without evidence. Three questions matter.

Structure. Your product may treat a customer as an organization with many users. The target may treat each user as a customer. Reconciling the two means decisions about history, identifiers and billing that no script makes for you.

Quality. Duplicates, free-text fields used for structured information and records that fail the product's own current validation all surface during migration. A sample of the data model and its constraints during diligence tells you roughly how much cleaning lies ahead.

Permission. Personal data was collected for stated purposes and under particular contracts. Those may limit whether you can combine it with your own data, move it to another region or pass it to your sub-processors. This is general information and not legal advice. Data protection rules differ by jurisdiction, and counsel should review the position.

Security belongs here as well, because integration connects networks. An attacker entered Starwood's network in 2014. Marriott completed its acquisition of Starwood in September 2016, and the intrusion was discovered only in September 2018. The UK regulator later fined Marriott £18.4 million in respect of the period after the GDPR took effect. The case is examined in Marriott and Starwood.

Identity and deployment

Two pieces of plumbing decide how soon customers see a joined-up product.

Identity is the first. Sales teams ask for a single login across both products within weeks of the announcement. If the target uses a standard identity service with clean separation between customers, connecting it to yours is contained work. If it wrote its own authentication years ago, with roles and permissions checked in hundreds of places through the code, the same request is a rebuild.

Deployment is the second. Establish where the product runs, whether its environments are defined in code or were configured by hand, how often it is released and who is on call. Moving the target onto your cloud contract appears on the synergy slide as a saving. If the environments cannot be re-created from code, it is a re-platforming project that comes first.

Team: who knows what, and for how long

Integration is carried out by the people who understand the target's system. They are also the people who keep the product running during integration, and the people most likely to receive offers elsewhere once the deal is announced.

The code history shows how concentrated that understanding is: which modules rest on one or two engineers, how much was written by people who have already left, and how much came from outside contractors. Compare that list with your retention plan. If the engineer who holds the data layer is not on it, the migration timetable has a dependency nobody has priced.

Sequence accordingly. Scheduling the hardest migration for the quarter in which retention awards vest is a common and avoidable mistake. The technology 100-day plan is the place to set the order.

How we approach it

We treat integration risk as something to be read from the code before signing. Every report includes an architecture map and code quality metrics, and it measures bus factor, knowledge concentration, contributor turnover and the share of external contributors from the code history.

For platform acquisitions we recommend the Expert Deep-Dive, which targets about two weeks from the moment the data room is ready to scan. A senior in-house expert holds architecture review sessions and team and process interviews, and assesses scalability and roadmap risk. We ask what a good CTO would ask.

Findings are expressed as remediation effort in engineer-months and as a cost band, and the work is sequenced into a plan for the first hundred days, with completed fixes verified by re-scan. The integration design remains yours; the report gives it facts to stand on. See how this fits a corporate transaction on our page for acquirers, or the full scope of technical due diligence.

Questions we are asked

Can integration cost be estimated before closing?

It can be bounded, provided someone has read the code and you have decided what kind of integration you intend. The estimate will still have a range. A range built on the dependency map and the data model is a different thing from one built on the last deal.

Is integration planning part of technical due diligence?

Diligence supplies the facts an integration plan needs: how the system is built, what it will cost to put right and who understands it. Choosing the target architecture for the combined business is your decision. A review scoped with your integration intention in mind makes that decision an informed one.

What if we plan to leave the target stand-alone?

Then the architectural questions matter less, but ownership, security exposure, operating cost and key-person risk matter just as much.

This article is general information for people working on software transactions. It is not legal, financial or insurance advice.